Hope to get the foward panels on the bottom this weekend and build the sides as well. the switch to standard stitch and glue should speed things up.
Also was slowed down by work, weather, and some damage to the transom on the Bolger 18 workskiff. (nothing serious, just a hairline crack in the glass where it had not adhered well. No water present!)
Also was slowed down by work, weather, and some damage to the transom on the Bolger 18 workskiff. (nothing serious, just a hairline crack in the glass where it had not adhered well. No water present!)