Pages

Tampilkan postingan dengan label ordering. Tampilkan semua postingan
Tampilkan postingan dengan label ordering. Tampilkan semua postingan

Jumat, 03 Juni 2016

ordering plywood

Based on my experience with the Michelak Vireo build, I am staying with the BS 1088 Okoume.  It comes in 98" panels which makes the scarfing much easier as it still allows for 8 panels after the scarfing saving time on layout.  at an 8:1 scarf it should be fine although I may add a little epoxy backing on the 3/8 panels. 

I realize that this wood needs to be protected for long term benefit but a coating or two of epoxy followed up by a good two part epoxy paint should last a lifetime.  This boat would be stored under cover as well, so not too concerned.  The other option is going with Merenti, but it is a little brittle to work with, and a little heavier than the Okoume.  Additional weight in a boat such as this is a poor idea. 
Read More..

Minggu, 20 Maret 2016

Building form in place

Thanks to Phil Gartlands generosity, I am the proud owner of a 12x4 x2 steel building form for the CS17.  It is now waiting for the load of plywood.  Going with bs 1088 okoume throughout. 


Read More..